Minimum Order Quantity | 1 Project |
Certification | ISO |
Operating Phase | Three Phase |
Design Type | Customized |
Operation Mode | Automatic |
Power | 35 KW |
Usage/Application | Bakery |
Capacity | More Than 400Kg/h |
Power Source | Electricity / Diesel |
Total Installed Capacity | 2000 Kgs (24 Hrs) |
Technology | Indigenous |
Required Processing Area | 1500 sft |
Required Manpower | 15 |
Required Total Water | 3000 Litre per day |
Required List of major Raw Materials | Wheat flour, Sugar , Food Chemicals, flavours |
Required list of Packing Materials | Laminate, CBB,Tape |
Time to Start The Unit | 90 days till Indian port , + 15 days to destination +15 days for erection = 120 days |
Guarantee | Guarantee of the plant is given by the supplier of the machine (Duly assured by us) |
Operation Mode | Automatic |
Total Installed Capacity | 15000 Pcs (24 Hrs) |
Technology | Indigenous |
Required Processing Area | 6000 Sft |
Required Manpower | 35 |
Required Total Electricity Load | 60 kW |
Required Total Water | 6000 Ltr Per Day |
Power Source | Electricity / Diesel |
Required List Of Major Raw Materials | Wheat Flour,Sugar,Food Chemicals,Flavors |
Required List Of Packing Materials | Laminated Pouches |
Time To Start The Unit | 90 Days Till Indian Port,+ 15 Days To Destination +15 Days For Erection = 120 Days |
Mode Of Service | Offline |
Brand | OHP |
Project Location | Pan India |
Business / Industry Type | Industrial |
Type Of Service Provider | Individual Consultant |
Total Installed Capacity | 20 Tons Per Day (24 Hrs) |
Technology | Indigenous |
Required Processing Area | 15000 sft |
Required Manpower | 55 |
Required Total Electricity Load | 200 kW |
Required Total Water | 7000 Ltrs Per Day |
Power Source | Electricity |
Required List Of Major Raw Materials | Wheat Flour, Sugar, HVO, Food Chemicals, etc |
Required List Of Packing Materials | CBB, Laminate, Tape |
Time To Start The Unit | 90 Days Till Indian Port , + 15 Days To Destination +15 Days For Erection = 120 Days |