Usage/Application | Beverages Industry |
Material | Mild Steel |
Type Of Machines | Juice Processing |
Power Source | Electricity / Steam |
Required Total Electricity Load | 200 kW |
Required Total Water | 75000 Ltrs Per Day |
Required Manpower | 50 |
Required List Of Major Raw Materials | Water, Pulp, Sugar, Food Chemicals |
Required List Of Packing Materials | Tetra Pack Laminate, CBB, Tape |
Required Minimum Land And Building | 15000 sft |
Total Installed Capacity | 7500 Pcs (200ml) Per Hour |
Time To Start The Unit | 120 Days Till Indian Port , + 15 Days To Destination +15 Days For Erection = 150 Days |
Type Of Machines | Bottling Machine |
Water Purification Process | Carbon Filtration |
Power Source | Electricity |
Required List Of Packing Materials | Pre Form,Bottle Caps,Label Roll,Shrink Wrap |
Time To Start The Unit | 90 Days Till Indian Port,+ 15 Days To Destination +15 Days For Erection = 120 Days |
Total Installed Capacity | 7200 Bottles Per Hour |
Required List Of Major Raw Materials | RO Water |
Technology | Indigenous |
Required Total Water | 75000 Ltrs Per Day |
Required Processing Area | 8000sft |
Required Total Electricity Load | 75 kW |
Required Manpower | 12 |
Usage/Application | Beverages Industry |
Required List Of Packing Materials | Pre Form,Bottle Caps,Label Roll,Shrink Wrap |
Total Installed Capacity | 7200 Bottles Per Hour |
Required Processing Area | 8000 sft |
Required List Of Major Raw Materials | Sugar,RO Water,Glycol |
Technology | Indigenous |
Required Manpower | 12 |
Power Source | Electricity |
Required Total Electricity Load | 75 kW |
Required Total Water | 75000 Ltrs Per Day |
Time To Start The Unit | 90 Days Till Indian Port,+ 15 Days To Destination +15 Days For Erection = 120 Days |
Minimum Order Quantity | 1 Piece |
Capacity | 60 BPM |
Capacity(Litre/Hour) | 10000 |
Usage/Application | Csd Drink |
Packaging Type | Pet Bottle |
Machinery | Indigenous |
Req Manpower | 50 |
Usage | Beverages Industry |
Power Source | Electric / Steam |
Type of Machine | Juice Processing |
Total Installed Capacity | 7500 pcs (200 ml) Per Hour |
Usage/Application | Beverages Industry |
Power Source | Electricity / Steam |
Type Of Machines | Juice Processing |
Time To Start The Unit | 120 Days Till Indian Port , + 15 Days To Destination +15 Days For Erection = 150 Days |
Required List Of Packing Materials | Tetra Pack Laminate, CBB, Tape |
Required Total Electricity Load | 200 kW |
Required Total Water | 75000 Ltrs Per Day |
Total Installed Capacity | 7500 Pcs (200ml) Per Hour |
Required Minimum Land and Building | 15000 sft |
Required List Of Major Raw Materials | Water, Pulp, Sugar,Food Chemicals |
Required Manpower | 50 |
Usage | Beverages Industry |
Total Installed Capacity | 7200 Bottles Per Hour |
Technology | Indigenous |
Required Processing Area | 8000 sft |
Required Manpower | 12 |