Usage/Application | Food Industry |
Automation Grade | Semi-Automatic |
Required List Of Packing Materials | Specific Laminate For Blast Freezer |
Power Source | Electricity |
Time To Start The Unit | 100days till Indian port , + 15 days to destination +25 days for erection = 140 days |
Total Installed Capacity | 250 kgs per hour |
Required Total Electricity Load | 90 KW |
Required Processing Area | 4000sft |
Required Manpower | 12 |
Required Total Water | 3500 Ltrs per day |
Required List Of Major Raw Materials | RO Water |
Technology | Indigenous |