Minimum Order Quantity | 1 Piece |
Usage/Application | Commercial |
Capacity | More Than 400Kg/h |
Operating Phase | Three Phase |
Operation Mode | Automatic |
Certification | ISO |
Design Type | Customized |
Power Source | Electricity / Diesel |
Required Processing Area | 6000 sft |
Required list of Packing Materials | Laminate, CBB,Tape |
Technology | Indigenous |
Guarantee | Guarantee of the plant is given by the supplier of the machine (Duly assured by us) |
Total Installed Capacity | 2000 Kgs (24 Hrs) |
Required Manpower | 35 |
Power | 75 KW |
Required Total Water | 6000 Litre per day |
Required List of major Raw Materials | Wheat flour, Sugar , Food Chemicals, flavours |
Time to Start The Unit | 90 days till Indian port , + 15 days to destination +15 days for erection = 120 days |
Minimum Order Quantity | 1 Piece |
Baking Capacity | 500Kg/h |
Capacity(kg/hr) | 500 Kg/h |
Usage/Application | Commercial |
Power Source | Diesel |
Roller Material | Stainless Steel |
Operation Mode | Automatic |
Design Type | Customized |