Usage/Application | Dairy Industry |
Material | Mild Steel |
Power Source | Electricity / Steam |
Total Installed Capacity | 7500 Pcs (200ml) Per Hour |
Required Minimum Land And Building | 15000 sft |
Required Manpower | 50 |
Required Total Electricity Load | 200 kW |
Time To Start The Unit | 120 Days Till Indian Port , + 15 Days To Destination +15 Days For Erection = 150 Days |